Installation of a ship crane on the m/v Pur-Navolok

The goal of our company is to provide ship repair services with a constantly high quality of service.

24 March 2017

March 04-07, 2017. As part of the project for the re-equipment of the Pur-Navolok motor vehicle developed by the Marine Engineering Bureau of St. Petersburg, the ship repair company Pomor Shipyard Ltd., completed the installation of the NMF PKL 24019-40012 deck hydraulic crane with a loading capacity of 40 tons. The project provides for improving the operational characteristics of the vessel in terms of the implementation of self-loading / unloading of cargo on the equipped or non-equipped shore, as well as for the possible detachment of ships.


Back to list