Dock repair of m/v “Tovra” completed. Repair hull work, repair of bottom-side valves were carried out.
The vessel was put into operation - 10/31/2017.
Dock repair of m/v “Tovra” completed. Repair hull work, repair of bottom-side valves were carried out.
The vessel was put into operation - 10/31/2017.