Descent m/v "Vyborg"

The goal of our company is to provide ship repair services with a constantly high quality of service.

21 December 2017

By order of the Federal State Institution "Marine Rescue Services of Rosmorrechflot", the repair of the valo line and VRS of the m/v "Vyborg" was carried out. 12/21/17 - the ship was lowered from the SLIP.

Pomor Shipyard Ltd. carries out adhesion of vessels up to 115 meters long and up to 3,000 tons in weight, and thanks to the ship’s ice-free water area, vessels can be hoisted during the freezing period of the Northen Dvina river in low-temperature conditions.


Back to list